Pre Term Solutions
The Cabling Group offers unique flexibility with our established pre-term facility also acting as a training centre and labour pool to back-up any fluctuations in volume of work and short notice requirements on site. To increase production in the pre-term facility, Installation Engineers from site can be brought in to meet the demand; likewise if there is an increase in the volume of installations, Pre-term Engineers are able to transfer from our facility to the client site. All our engineers have received training in both roles.• Our pre-term facility ensures that any installation is delivered in the most efficient and cost effective way possible. Without the distraction or interruption of a busy site engineers can efficiently conclude their work in a quality maintained environment. This in turn reduces the amount of time required to spend on site and ultimately lowers the cost.

• Materials and waste are re-cycled and any copper wastage calculated and kept to an absolute minimum. Copper and fibre will always be fluke tested before they leave the pre-term facility ensuring that no faulty batches of cable are delivered to site.
The pre-term facility has the ability to run 24/7 maximising output and increasing customer deliverables.
• The Cabling Group has developed a patented Cable Trolley System which enables the fastest and most efficient delivery and installation of data and fibre to the client site. This in turn saves both time and money, greatly reducing disruption to site.
The Cabling Group work on a sub-contractor basis only ensuring our business is ready to meet the fast moving and demanding needs of our clients. We offer installations in every shape and size whether it is a installation is 200 sq ft or 50,000 sq ft
We have an engineering resource of 60 data engineers with various levels of skills, knowledge and experience. From Site supervisors down to Trainee engineers, the Cabling group will form a specific team to match an installation’s requirements ensuring the best deliverables.